I need a solution
I have a tape library with two FC LTO-4 drives.
My library is listed as Library02 with IBM 0001 and IBM 0002.
All my policies are told to use Library02.
I have been having a few dup jobs that que up waiting for IBM0001 when IBM0002 is free.
I look at the start times and current job using IBM0001 started 45 minutes before the qued up job.
What is going on?